Custom Homes

Requires a concrete base foundation however, since a Renco structures are lighter than concrete structures, the foundation can be engineered to be cheaper by using less concrete and steel. If pilings are necessary, again there will be less pilings required.

The entire structural set up can be finished in 7 to 15 days depending on the size of the project.